To speed the superstructure installation, as well as promote safer working conditions, the uppermost control tower steel structure was assembled at the ground elevation and lifted into place in a single tandem crane lift. This exterior finish provides energy efficiency while being much less expensive than stucco or panels.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |